PTP
PTP Website
My Order 0 0.00 €
LoginRegister
  • Home
  • PTP Metallic
  • PTP Composite
  • Other Schemes
  • General Information
  • FAQs
  • Contact

PTP Metallic 2019 results deadline information

Update : 13/05/2019

Dear participants,

We inform you that for the following kits results will be accepted until the 15th May so if you haven’t yet submitted the results please do so as soon as possible. The analysis for these kits will start on the 16th May.

1-3-2019 – Tensile Flat - Aluminium

1-4-2019 – Tensile - Tubular

1-5-2019 – Tensile - Cylindrical - Steel

6-1-2019 – Hardness Rockwell Vickers - Steel

6-2-2019 – Hardness Brinell Rockwell B - Aluminium

6-3-2019 – Microhardness - Micro HV

6-4-2019 – Hardness - Brinell  - Rockwell Steel

7-1-2019 - Salt Spray -  Mass loss determination

8-1-2019 – Chemistry - Aluminium

8-2-2019 – Chemistry - Nickel base

8-3-2019 – Chemistry - Steel

8-4-2019 – Chemistry - Titanium

10-1-2019 – Grain size

10-2-2019 – Alpha case

10-5-2019 – Porosity – photo analysis

10-7-2019 – Conductivity

10-8-2019 – Thickness measurement - Micro + Eddy current

11-2-2019 – Compression

12-2-2019 – Fasteners – wedge tensile

12-3-2019 – Fasteners - Plating thickness

12-4-2019 – Fasteners - Tensile Strength

12-5-2019 – Fasteners - Tensile Fatigue

12-6-2019 – Fasteners - Double Shear

 

In order to have a more robust statistical analysis , results for the following kits will be accepted until the 31st May :

 

1-1-2019 –Tensile - Cylindrical - Titanium

1-2-2019 - Tensile - Cylindrical - Aluminium

1-6-2019 - Tensile - Cylindrical - Inconel

2-1-2019 - Tensile - Cylindrical – Steel (Elevated temperature)

3-1-2019 - Creep

3-2-2019 - Stress rupture

4-1-2019 - Fracture toughness – K1c

4-2-2019 - Fracture toughness - dadN

5-1-2019 – Charpy - KCV – Steel

5-2-2019 - Charpy - KCV – Steel (-30°C)

7-2-2019 - Salt Spray - Corrosion

7-3-2019 – Stress Corrosion

8-7-2019 – Chemistry – Nickel Powder

9-1-2019 – LCF - Cylindrical specimen (Elevated temperature)

9-2-2019 – HCF - Flat (T Type specimen)

10-3-2019 - Alloy depletion

 

For the kit 10-4-2019 inclusion (photo analysis) : the deadline is fixed at 15th June.

 

For the kit 10-9-2019 (adhesion cross cut test): the deadline is 1st June.

Get in touch

Contact us directly by email or phone at the following:

info@ptpscheme.com

Tel. +33 (0)5 34 39 93 88

Latest News

  • New IRR Services
  • PTP Composite 2019 scheme update
  • PTP Metallic 2019 results deadline information
© 2019, All Rights reserved to Element
  • Terms & Conditions
  • Privacy policy
  • Cookie policy
  • Accessibility